Extended Rig Mode

This mode requires you to individuate rigs. This involves:

  • Creating each rig separately, giving it a name and defining its costs in the corresponding Rig Node.
  • Mobilizing rig units in order to have them on site as a prerequisite for drilling wells, by means of a Rig Mobilization / Demobilization job (or by activating the option to Use automatic mobilization).
  • Linking each rig to its wells (this is done in the Well Drilling Info Tab).
Extended Rig Mode