Extended Rig Mode
This mode requires you to individuate rigs. This involves:
- Creating each rig separately, giving it a name and defining its costs in the corresponding Rig Node.
- Mobilizing rig units in order to have them on site as a prerequisite for drilling wells, by means of a Rig Mobilization / Demobilization job (or by activating the option to Use automatic mobilization).
- Linking each rig to its wells (this is done in the Well Drilling Info Tab).